Paving slabs go down outside the former public toilets - now destined to be a coffee shop - near the bridge over the River Uck, Uckfield.

Uckfield improvements update

New kerbs are in place and paving slabs are being laid from River Way to Uckfield Railway Station as week three of the improvement works gets under way.

Finishing touches are made outside the stretch of shops between Peacocks and The Lounge and it is possible to access each of the shops from the pavement.

Our pictures were taken this morning.

Roadworks Oct 7i

All is ready for paving slabs to be laid between River Way and Uckfield Railway Station.

Roadworks Oct 7

Finishing touches remain to be done on the section of paving between Peacocks and The Lounge.

See also:

Coffee bar in former Uckfield public loos – plan approved

Bridge Cottage work update – week one

Concern grows about second stage of roadworks in Uckfield

Find local businesses in our Uckfield Directory

How to advertise on UckfieldNews.com

 

 

Share this story

Sign up to receive daily news alerts

I'd like to receive updates every: