Demolition progress at Uckfield College

Heavy machinery on the Uckfield College site, photographed from Lime Tree Avenue. The leisure centre roof can be seen to the right.

Demolition of old buildings is under way at Uckfield College as these photographs taken at the end of December show.

A new school building, which stretches along the front of the college site parallel with Downsview Crescent opened in November.

Work is under way again on the next stage of development.

Looking derelict and partially demolished is one of the buildings on the Uckfield College site.

Following demolition a new building will go up to the south of the site and the project will be finished with a new full-sized rugby pitch and multi-use games are in the centre of the site between the new buildings.

Read more about the plans in another Uckfield News story: Uckfield College redevelopment plans revealed.

Boards surround the development site at Uckfield College. A new building which opened in September can be seen left.

Here’s a plan showing the new sports field, multi-use games area between new buildings in the centre of the redeveloped college site. The red broken line shows where the existing main building was.

See also:

Wealden Covid-19 deaths – one of the worst weeks on record

‘Major incident’ declared over Covid-19 pressures in Sussex

Wealden Local Plan – still time to give your views

Find local businesses in our Uckfield Directory

How to advertise on UckfieldNews.com

Share this story

Sign up to receive daily news alerts

I'd like to receive updates every: