Roadworks cause traffic tailbacks at Piltdown

Traffic tailbacks are being caused in both directions on the A272 at Piltdown where roadworks are under way.

One reader told us it took 45 minutes to get through at around noon today (January 11).roadworks-sign-2

A CCTV survey and investigation connected with drainage works are being undertaken near Old Spot Farm.

The roadworks began today and are expected to run until February 5. Work will take place between 9.30am and 4pm each day.

Details of delays in the Uckfield area can be found on the BBC Travel website.

See also:

David Bowie and Uckfield’s part in his different coloured eyes

Tickets go on sale for Ian Waite masterclass in Uckfield

Uckfield High Street shop to let

Find local businesses in our Uckfield Directory

How to advertise on UckfieldNews.com

Share this story

Sign up to receive daily news alerts

I'd like to receive updates every: