Trenches for ground source heating loops could be dug in this field at Framfield. Afterwards the land could revert to normal use.

Plans to install heating loops in Framfield field

Plans have been submitted to install a ground source heat pump and heating loops in a Framfield field.

The set up would provide a heat source for under-floor heating to ground floors and first floors of a house at Long Meadow Farm in Streele Lane. It would also provide all the domestic hot water.

The piping for the heat pump would be in a field next door to the house.

Trenches

Five trenches, totalling 1700 metres, would be dug in the centre of the field and afterwards they would be filled in so that the land could still be used as previously.

Documents submitted with the planning application say the system is “quiet in operation, issues no emissions, is very safe, and requires very little maintenance”.

The plans, before Wealden Council, have been submitted by Mr Nigel Davies of Long Meadow Farm.

See also:

Roads on Sand Ridge estate at Ridgewood to remain in private ownership

Nine-year-old Amelie donates her hair to charity

Objection to plans for four homes on The Cottage site in Hempstead Road

Find local businesses in our Uckfield Directory

How to advertise on UckfieldNews.com

 

Share this story

Sign up to receive daily news alerts

I'd like to receive updates every: